Tsukuba Stone | Japan
Nominal power installed
2,2MW
Installed peak power
# MW
Estimated annual production
2,737MWH
Dairy produce
7,5MWH
Start-up date
September 15, 2015
Production (5/4/2018)
70.794MWH
Contact us
If you have any doubts or are thinking about developing a photovoltaic solar energy project, do not hesitate to contact us through any of these means.