Tsukuba Stone | Japan

Nominal power installed

2,2MW

Installed peak power

# MW

Estimated annual production

2,737MWH

Dairy produce

7,5MWH

Start-up date

September 15, 2015

Production (5/4/2018)

70.794MWH

Contact us

If you have any doubts or are thinking about developing a photovoltaic solar energy project, do not hesitate to contact us through any of these means.

    He leído y acepto la Política de Privacidad.

    Share This