Fukuroda | Japan
Nominal power installed
31MW
Installed peak power
32MW
Estimated annual production
38.389MWH
Dairy produce
105MWH
Start-up date
September 15, 2015
Production (5/4/2018)
981.285MWH
Contact us
If you have any doubts or are thinking about developing a photovoltaic solar energy project, do not hesitate to contact us through any of these means.