Palo Leyte | Philippines

Nominal power installed

45MW

Installed peak power

50MW

Estimated annual production

67.613MWH

Dairy produce

185,24MWH

Start-up date

March 15, 2016

Production (26/4/2018)

1.430.061MW

Contact us

If you have any doubts or are thinking about developing a photovoltaic solar energy project, do not hesitate to contact us through any of these means.

    He leído y acepto la Política de Privacidad.

    Share This